Completed ICC (I-270 - I-95) to open on 11/22/2011

Started by WMAveteran, October 29, 2011, 01:09:55 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

WMAveteran

 
ICC SET TO OPEN TO I-95 NOV. 22
Test Drive the ICC at No Charge through Dec. 4;
Per-Mile Toll Rates Remain the Same as Current Rates on First Segment

Maryland Transportation Authority (MDTA) Chairman Beverley K. Swaim-Staley today announced that the State will open the next 10.35 miles of Maryland's Intercounty Connector (ICC)/MD 200 by 6 a.m. on Tuesday, Nov. 22, 2011.  With this opening, the ICC will connect Montgomery and Prince George's counties from I-270/I-370 at Shady Grove to I-95 at Laurel.

"By morning rush hour on Nov. 22, the ICC will finally link the I-270 and I-95 corridors providing motorists with a viable option to the existing congested local road network in Maryland's Washington suburban region," said MDTA Chairman Swaim-Staley.  "I am also pleased to announce that our citizens will once again be able to 'test drive' the entire ICC at no charge between the opening on Nov. 22 through Dec. 4, helping us to test the tolling equipment under actual traffic conditions."

When full toll collection begins on the ICC on Dec. 5, drivers of cars and light trucks with E-ZPass® will pay a Peak toll rate of $0.25/mile, Off-peak rate of $0.20/mile and Overnight rate of $0.10/mile as they do today to travel the ICC's first segment. 

"The ICC per-mile toll rates, at the low end of the ICC tolling plan approved by the MDTA Board in December 2009, remain the same when we open the next segment," said MDTA Executive Secretary Harold M. Bartlett.  "Our goal for the ICC is to provide reliable travel times between the I-270 and I-95 corridors.  Today, the morning commute between Laurel and Gaithersburg takes about 47 minutes on stop-and-go local roads.  This same trip will take just more than 17 minutes on the ICC."

The ICC is a variably priced toll facility where higher tolls are charged during peak-travel times (Monday – Friday, 6 – 9 a.m. and 4 – 7 p.m.) and reduced tolls are charged when traffic volumes are lower.  ICC tolls are collected electronically at highway speeds using E-ZPass and video-tolling technology.  There are no toll booths or cash toll collection on the ICC, Maryland's first all-electronic toll facility.

In addition to existing connections at I-270/I-370 at Shady Grove and MD 97 (Georgia Avenue), the next segment of the ICC will open up new connections at MD 182 (Layhill Road), MD 650 (New Hampshire Avenue), US 29 (Columbia Pike), Briggs Chaney Road (Briggs Chaney to eastbound ICC and westbound ICC to Briggs Chaney) and at I-95 in Laurel.

To travel the entire ICC one way between I-95 and I-370, drivers of cars and light trucks with E-ZPass will pay $4 in Peak hours, $3.20 Off-peak and $1.60 Overnight.  Please refer to the attachments included with this release for the ICC/MD 200 Toll Schedules (I-270/I-370 to I-95).

Drivers without a valid E-ZPass account will pay a Video Toll Rate to travel the ICC.  A Notice of Toll Due will be sent to the registered owner of the vehicle for the cost of the Video Toll, which is 150% of the E-ZPass toll rate, with a minimum video surcharge of $1 and a maximum of $15.

To sign up for E-ZPass, visit ezpassmd.com to enroll online or get a list of E-ZPass "On the Go" retail locations.  E-ZPass Stop-in Centers are located at local Motor Vehicle Administration offices in Gaithersburg and Beltsville and are adjacent to Maryland toll facilities.

For additional tolling information, visit mdta.maryland.gov/TollFacilities/ICC.html.  The MDTA will review ICC toll rates periodically and may adjust them within the tolling plan approved by the MDTA Board to help manage traffic congestion and meet revenue needs.

The State Highway Administration (SHA) is managing ICC construction, and the MDTA helped finance and owns, operates and maintains this new variably priced toll facility.  The final segments of the ICC between I-95 and Virginia Manor Road and US 1 are anticipated to be complete in 2014.

Dateline for the ICC Opening:
• Tuesday, Nov. 22, by 6:00 a.m.:  ICC opens to I-95 (weather permitting).
• Tuesday, Nov. 22 – Sunday, Dec. 4 at midnight: Test-drive period -- no tolls will be collected on the entire roadway from I-370 to I-95.
• Monday, Dec. 5, 12:01 a.m.: Toll collection begins on the entire roadway from I-370 to I-95.



WayneNYC

I've been waiting patiently (sometimes impatiently) for the rest of the ICC to open.  I don't see where I'll use the I-95 to US Rt 1 segment (whenever it opens), but I'll defintely make good use of the rest of the ICC.  In fact, it would've come in handy for me twice this weekend, had the B & C segments been open.

WMAveteran

Quote from: WayneNYC on October 31, 2011, 10:59:09 AM
I've been waiting patiently (sometimes impatiently) for the rest of the ICC to open.  I don't see where I'll use the I-95 to US Rt 1 segment (whenever it opens), but I'll defintely make good use of the rest of the ICC.  In fact, it would've come in handy for me twice this weekend, had the B & C segments been open.

Wayne: I have never been in love with an inanimate object in my life but I do love this road (lol).  The amount of time it has saved me since it was partially opened is amazing.  IMHO, I believe this road is the single most important contribution to our balanced transportation network since the completion of the Beltway in the early 1960's, plus it generated two great new bus routes which I patronize at every opportunity.   

WayneNYC

#3
Quote from: WMAveteran on November 03, 2011, 01:19:13 AM
Quote from: WayneNYC on October 31, 2011, 10:59:09 AM
I've been waiting patiently (sometimes impatiently) for the rest of the ICC to open.  I don't see where I'll use the I-95 to US Rt 1 segment (whenever it opens), but I'll defintely make good use of the rest of the ICC.  In fact, it would've come in handy for me twice this weekend, had the B & C segments been open.

Wayne: I have never been in love with an inanimate object in my life but I do love this road (lol).  The amount of time it has saved me since it was partially opened is amazing.  IMHO, I believe this road is the single most important contribution to our balanced transportation network since the completion of the Beltway in the early 1960's, plus it generated two great new bus routes which I patronize at every opportunity.   

LOL - I think I feel the same as you.  One thing I dislike about living in Gaithersburg is it's proximity to I-95 and the time it takes.  Many, many times when I find myself heading to/from points east of G'burg, I'ved said that I'll be so happy when all of the ICC is open.  I think I'll take a spin on the new sections when they open.  While there was lots of opposition to the ICC being built, I think it is important, especially since the suburbs north of The District continue to get more densely populated.  I'm glad it's finally here.

NewFlyer9736BCT

it's about time...finally an easier route to get to Baltimore and points north, would be nice without having to pay tolls but it is what it is.
I do wish there was an exit for Muncaster Mill Rd, I drive around there a lot and it would be faster if i went directly there rather than taking local roads.
Route Q2. Destination: Silver Spring Station

Tritransit Area

With the opening of this final section of the ICC, will the 201 use it all the way to Gaithersburg/Shady Grove then?  I was pretty alarmed by the amount of time we spent on local roadways, and the journey took quite a while.
My favorite buses:
1989 SEPTA AN440: 19 years in service
1989 NJT Metro Bs: 21 years in service
1990 WMATA 93/9400 Flxes: 20 years in service!
1990-92 Ride-On Orion Is: 17-18 years in service!

Tell me again I have no taste in buses...

NewFlyer9736BCT

#6
Quote from: Tritransit Area on November 14, 2011, 11:29:07 AM
With the opening of this final section of the ICC, will the 201 use it all the way to Gaithersburg/Shady Grove then?  I was pretty alarmed by the amount of time we spent on local roadways, and the journey took quite a while.

according to the route map, it's still going to through Columbia Pike and Route 32 to go to Burtonsville P&R, but those roads are like freeways so it should be a quicker ride than going through Route 28/198

and yeah it did take a while going through the local roads, I haven't rode the 201 yet but I did go to Baltimore once through that way, it was so long that it was better to just take the old way and go through 495.
Route Q2. Destination: Silver Spring Station

WayneNYC

As of Saturday, I've already made 3 roundtrips on the newly opened portion of the ICC.  It's so nice to not have to use I-495 (and local routes) to travel between I-95 and I-270.  I'm so happy that the ICC (to/from I-95) is finally open and it'll definitely make the route 201 even more attractive.

NewFlyer9736BCT

this morning i drove to Baltimore via the ICC. It took 40 minutes rather than the usual hour to hour and a half. I love it
Route Q2. Destination: Silver Spring Station