MTA bus and Metro resume at 12:00 Noon. Light rail later today after grade crossing gates reinstalled. Gates taken down to prevent wind damage.
WMATA back on line at 2:00PM on a Sunday schedule.
Ride-On, The Bus, FFX, ART, DASH still off line.
Quote from: mrpete on October 30, 2012, 10:20:24 AM
MTA bus and Metro resume at 12:00 Noon. led light (http://www.niceledlights.com) rail later today after grade crossing gates reinstalled. Gates taken down to prevent wind damage.
WMATA back on line at 2:00PM on a Sunday schedule.
Ride-On, The Bus, FFX, ART, DASH still off line.
It was nice addition and I am strange there is no replies to the post