It looks like GRTC is going to get some of the route cuts that it wanted. Although I do agree with a couple of them, The rest don't really sit well. I think they should've followed the recommendations highlighted in the Comprehensive Operational Analysis. So long for one of my 2010 hopes.
Although the GRTC has been waving these cuts in the air for quite sometime, they are considered quite controversial.
More information on the route cuts can be read here:
http://ridegrtc.com/documents/2009_12_11%20Route%20Reductions-Eliminate.pdf
As for the Comprehensive Operational Analysis and it's route recommendations, read pages 8-39:
http://ridegrtc.com/images/GRTC%20COA%20Sec6-7.pdf
For the COMPLETE COA report:
http://ridegrtc.com/images/GRTC_Final_COA.pdf
NOTE: All three are in PDF format. You'll need Adobe Reader to view them.